{"id":57339,"date":"2025-09-26T10:11:28","date_gmt":"2025-09-26T10:11:28","guid":{"rendered":"https:\/\/becolve.com\/casos-exito\/aena-electrical-system-control\/"},"modified":"2025-09-26T10:11:28","modified_gmt":"2025-09-26T10:11:28","slug":"aena-electrical-system-control","status":"publish","type":"casos-exito","link":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/","title":{"rendered":"AENA &#8211; Electrical System Control"},"content":{"rendered":"<p><b>AENA<\/b> <span style=\"font-weight: 400;\">is a public company that<\/span> <b>manages airports of general interest in Spain.<\/b><span style=\"font-weight: 400;\">. The company controls 51% of ENAIRE and operates in 46 airports and two national heliports. One of them is the  <\/span><b>Josep Tarradellas Barcelona \u2013 El Prat Airport<\/b><span style=\"font-weight: 400;\">, the largest in extension and traffic in Catalonia and the second with the highest traffic in the country.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Its spacious surface complicates the coordination of all the actors necessary for the operation of the airport, among them, those that are part of the current system. Given this, AMPER committed to <\/span><b> strengthening the aerodrome&#8217;s electrical infrastructure to provide more efficiency and safety to all users and operators involved.<\/b><\/p>\n<h4><b>Added Difficulty more than Overcome<\/b><\/h4>\n<p><span style=\"font-weight: 400;\">The magnitude of the project required careful planning, a collaborative approach, and innovative technological solutions to ensure success in the modernization and improvement of the main system.<\/span> <b>Shutdowns in operability could not be allowed<\/b><span style=\"font-weight: 400;\">: everything had to continue working while the new systems were implemented.<\/span> <\/p>\n<p><span style=\"font-weight: 400;\">In addition, the development of new applications in<\/span> <b>AVEVA InTouch HMI<\/b> <span style=\"font-weight: 400;\">and<\/span> <b>AVEVA System Platform<\/b> <span style=\"font-weight: 400;\">involved working with<\/span> <b>complex technologies<\/b> <span style=\"font-weight: 400;\">and under the<\/span> <b>specific conditions<\/b> <span style=\"font-weight: 400;\">of the CELT power plant. Without being impressed by an unfavorable scenario at first, the result was optimal: it was possible to mold a <\/span> <b>unique tool for decision-making<\/b> <span style=\"font-weight: 400;\">in the central control station.<\/span><\/p>\n","protected":false},"featured_media":57340,"menu_order":0,"template":"","categories":[],"arquitectura":[],"area":[],"sector":[1339],"productos-tax":[112,336,338],"soluciones-tax":[],"marcas-tax":[374],"class_list":["post-57339","casos-exito","type-casos-exito","status-publish","has-post-thumbnail","hentry","sector-airports","productos-tax-aveva-historian","productos-tax-aveva-intouch-hmi","productos-tax-aveva-system-platform","marcas-tax-aveva"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>AENA - Electrical System Control | Caso de \u00e9xito<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"AENA - Electrical System Control | Caso de \u00e9xito\" \/>\n<meta property=\"og:description\" content=\"AENA is a public company that manages airports of general interest in Spain.. The company controls 51% of ENAIRE and operates in 46 airports and two national heliports. One of them is the Josep Tarradellas Barcelona \u2013 El Prat Airport, the largest in extension and traffic in Catalonia and the second with the highest traffic [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/\" \/>\n<meta property=\"og:site_name\" content=\"Becolve Digital\" \/>\n<meta property=\"og:image\" content=\"https:\/\/becolve.com\/wp-content\/uploads\/2023\/09\/fondo-lineas-abstractas-azules-onduladas-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1792\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Logitek_es\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n\t<meta name=\"twitter:label2\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data2\" content=\"prueba roles\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/\",\"url\":\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/\",\"name\":\"AENA - Electrical System Control | Caso de \u00e9xito\",\"isPartOf\":{\"@id\":\"https:\/\/becolve.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/becolve.com\/wp-content\/uploads\/2023\/09\/fondo-lineas-abstractas-azules-onduladas-scaled.jpg\",\"datePublished\":\"2025-09-26T10:11:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#primaryimage\",\"url\":\"https:\/\/becolve.com\/wp-content\/uploads\/2023\/09\/fondo-lineas-abstractas-azules-onduladas-scaled.jpg\",\"contentUrl\":\"https:\/\/becolve.com\/wp-content\/uploads\/2023\/09\/fondo-lineas-abstractas-azules-onduladas-scaled.jpg\",\"width\":2560,\"height\":1792},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/becolve.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Casos de exito\",\"item\":\"https:\/\/becolve.com\/en\/casos-exito\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"AENA &#8211; Electrical System Control\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/becolve.com\/en\/#website\",\"url\":\"https:\/\/becolve.com\/en\/\",\"name\":\"Becolve Digital\",\"description\":\"Transformaci\u00f3n digital en industria e infraestructuras\",\"publisher\":{\"@id\":\"https:\/\/becolve.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/becolve.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/becolve.com\/en\/#organization\",\"name\":\"Becolve Digital\",\"url\":\"https:\/\/becolve.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/becolve.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/becolve.com\/wp-content\/uploads\/2023\/04\/becolve-logo-h-black_200.png\",\"contentUrl\":\"https:\/\/becolve.com\/wp-content\/uploads\/2023\/04\/becolve-logo-h-black_200.png\",\"width\":200,\"height\":64,\"caption\":\"Becolve Digital\"},\"image\":{\"@id\":\"https:\/\/becolve.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/Logitek_es\",\"https:\/\/www.linkedin.com\/company\/becolve-digital\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"AENA - Electrical System Control | Caso de \u00e9xito","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/","og_locale":"en_US","og_type":"article","og_title":"AENA - Electrical System Control | Caso de \u00e9xito","og_description":"AENA is a public company that manages airports of general interest in Spain.. The company controls 51% of ENAIRE and operates in 46 airports and two national heliports. One of them is the Josep Tarradellas Barcelona \u2013 El Prat Airport, the largest in extension and traffic in Catalonia and the second with the highest traffic [&hellip;]","og_url":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/","og_site_name":"Becolve Digital","og_image":[{"width":2560,"height":1792,"url":"https:\/\/becolve.com\/wp-content\/uploads\/2023\/09\/fondo-lineas-abstractas-azules-onduladas-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Logitek_es","twitter_misc":{"Est. reading time":"1 minute","Written by":"prueba roles"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/","url":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/","name":"AENA - Electrical System Control | Caso de \u00e9xito","isPartOf":{"@id":"https:\/\/becolve.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#primaryimage"},"image":{"@id":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#primaryimage"},"thumbnailUrl":"https:\/\/becolve.com\/wp-content\/uploads\/2023\/09\/fondo-lineas-abstractas-azules-onduladas-scaled.jpg","datePublished":"2025-09-26T10:11:28+00:00","breadcrumb":{"@id":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#primaryimage","url":"https:\/\/becolve.com\/wp-content\/uploads\/2023\/09\/fondo-lineas-abstractas-azules-onduladas-scaled.jpg","contentUrl":"https:\/\/becolve.com\/wp-content\/uploads\/2023\/09\/fondo-lineas-abstractas-azules-onduladas-scaled.jpg","width":2560,"height":1792},{"@type":"BreadcrumbList","@id":"https:\/\/becolve.com\/en\/casos-exito\/aena-electrical-system-control\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/becolve.com\/en\/"},{"@type":"ListItem","position":2,"name":"Casos de exito","item":"https:\/\/becolve.com\/en\/casos-exito\/"},{"@type":"ListItem","position":3,"name":"AENA &#8211; Electrical System Control"}]},{"@type":"WebSite","@id":"https:\/\/becolve.com\/en\/#website","url":"https:\/\/becolve.com\/en\/","name":"Becolve Digital","description":"Transformaci\u00f3n digital en industria e infraestructuras","publisher":{"@id":"https:\/\/becolve.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/becolve.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/becolve.com\/en\/#organization","name":"Becolve Digital","url":"https:\/\/becolve.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/becolve.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/becolve.com\/wp-content\/uploads\/2023\/04\/becolve-logo-h-black_200.png","contentUrl":"https:\/\/becolve.com\/wp-content\/uploads\/2023\/04\/becolve-logo-h-black_200.png","width":200,"height":64,"caption":"Becolve Digital"},"image":{"@id":"https:\/\/becolve.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/Logitek_es","https:\/\/www.linkedin.com\/company\/becolve-digital\/"]}]}},"_links":{"self":[{"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/casos-exito\/57339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/casos-exito"}],"about":[{"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/types\/casos-exito"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/media\/57340"}],"wp:attachment":[{"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/media?parent=57339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/categories?post=57339"},{"taxonomy":"arquitectura","embeddable":true,"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/arquitectura?post=57339"},{"taxonomy":"area","embeddable":true,"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/area?post=57339"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/sector?post=57339"},{"taxonomy":"productos-tax","embeddable":true,"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/productos-tax?post=57339"},{"taxonomy":"soluciones-tax","embeddable":true,"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/soluciones-tax?post=57339"},{"taxonomy":"marcas-tax","embeddable":true,"href":"https:\/\/becolve.com\/en\/wp-json\/wp\/v2\/marcas-tax?post=57339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}