Project objectives
  • Transfer to the new power plant without losing operability.
  • Simplicity in the design and handling of the application.
  • Allow the user to immediately identify which elements have generated an alarm.
  • Intuitive navigation through the different subsystems of the installation.
  • Real-time management of electrical incidents generated.
Challenges
  • Guarantee the operability of the airport facilities at all times.
  • Great variety of critical equipment to integrate.
  • Integration of data collected from the generator set control system.
  • Integration into the control system itself of other elements from other projects in parallel execution (parking, new terminal, etc.).
Result
  • The objective of maximum availability of all control elements (SCADA, communications and field) has been achieved.
  • The operability of the airport has not been paralyzed at any time.
  • The design of the new SCADA makes an intuitive and realistic representation of the facilities.
  • When an alarm is generated, the triggering event can be easily deduced.
  • Integration of transformation centers from other works into the single electrical control system.
Solutions and products used
  • System Platform
  • InTouch
  • Historian